Concrete Volume Calculator

Enter length, width and thickness to get the concrete volume you need and how many truck loads that is.

Inputs

m
m
m
%
Usually 3-5% for slabs, 5-10% for pumped or irregular work

Result

Formula

VolumeV = length × width × thickness
With wasteV_total = V × (1 + waste %)
Truck loadsN = ceil(V_total ÷ truck capacity)
A 6 m × 4 m × 0.15 m slab: V = 3.6 m³, 3.78 m³ with 5% waste, one 9 m³ truck load.

Concrete grades, typical uses and material reference

GradeTypical useCement (kg/m³)Sand (m³/m³)Gravel (m³/m³)
C15Blinding, plain footings2600.550.88
C20Floors, retaining walls, ordinary footings2900.520.86
C25Beams, slabs, columns, ring beams3200.480.85
C30Load-bearing structures, most common3600.450.83
C35High-rise columns, bridges, precast4000.420.81
C40Prestressed and long-span structures4400.400.79

Quick volume for common members

MemberFormulaExample
Rectangular slablength × width × thickness6 × 4 × 0.15 = 3.6 m³
Rectangular beamwidth × depth × clear span0.3 × 0.6 × 5 = 0.9 m³
Rectangular columnsection L × section W × height0.5 × 0.5 × 3 = 0.75 m³
Round column3.1416 × radius² × height3.1416 × 0.25² × 3 = 0.59 m³
Strip footingwidth × depth × length1.2 × 0.3 × 50 = 18 m³

FAQ

Why add a waste allowance to concrete volume?
Real pours lose material to spillage, over-excavation, formwork deflection and pump residue. Use 3-5% for slabs and beams, 5-10% for footings, irregular shapes or pumped concrete. Running short mid-pour creates a cold joint, which costs far more than the extra cubic metre.
How do cubic metres and cubic yards convert?
1 cubic yard = 0.7646 m³, so divide m³ by 0.7646 to order in yards. In China 1 方 is exactly 1 m³.
How do I handle columns and round footings?
Round column: V = π × r² × h. Tapered round footing: V = πh/3 × (R² + Rr + r²). This calculator uses a rectangular prism, so for a cylinder compute 3.1416 × radius² × height separately.