算BuildCalc

Mass Concrete Temperature Calculator

Placement temperature, adiabatic rise and peak temperature in one step.

Inputs

kg/m³
℃
kg/m³
℃
kg/m³
℃
kg/m³
℃
kJ/kg

Result

Formula

T0 = Σ(mi·ti) / Σmiweighted by mass
Th = mce·Q / (c·ρ)c = 0.97, ρ = 2400
Tmax = T0 + Th·kk = 0.60 / 0.75 / 0.85 by thickness
surface ≥ Tmax − 25 ℃differential control
Cement 300 kg at 40 ℃, sand 700 at 30 ℃, gravel 1150 at 28 ℃, water 170 at 15 ℃: placement temperature 29.2 ℃; with Q = 335 kJ/kg the adiabatic rise is 43.2 ℃; at 1-2 m thickness k = 0.75 gives 32.4 ℃ of real rise and a 61.6 ℃ peak, so the surface must stay above 36.6 ℃.

FAQ

Does cement temperature really matter that much?
Yes. Bulk cement straight from a tanker can be 70-80 ℃ in summer while aggregate sits near 30 ℃. Cement is only about 13% of the mass but 50 ℃ hotter, contributing 6-7 ℃ to placement temperature - the easiest item to overlook. Dropping cement from 75 to 45 ℃ cuts placement temperature by about 4 ℃, far more effective than wetting aggregate.
What is the difference between adiabatic and actual rise?
Adiabatic rise assumes no heat loss at all - an upper bound. Real elements lose heat to air and ground, so a factor below 1 applies. Thin sections dissipate far more: a 1 m wall may reach only 60% of the adiabatic value, while a 3 m raft exceeds 85% and behaves almost adiabatically. That is why mass concrete is defined by minimum dimension over 1 m, not by volume.
Why the 25 ℃ core-surface limit?
Differential temperature creates thermal stress: the core expands while the surface is held back, putting the surface in tension when its tensile strength is still low. A 25 ℃ differential corresponds to roughly 1 MPa of surface tension, close to early-age capacity. Beyond that, surface cracks form and later become paths for water and chloride. The point is not cooling, it is narrowing the differential.

Related calculators

Results are estimating aids only and are not a design basis. Construction and final accounts must follow the drawings, the applicable standards and an approved method statement. Anything affecting structural safety, shoring or falsework must be checked by a suitably qualified engineer.